Auxiliary Climate Control Assembly: Installation
- Install the climate control assembly.
- Tighten the bolts to 10 Nm (7 lb.ft).
- Connect and secure the electrical connectors.
- Install the sealing plate.
- Tighten the bolts to 10 Nm (7 lb.ft).
- Connect and secure the coolant hoses.
- Secure the clips.
- Remove the hose clamps.
- Connect the A/C pipes.
- Clean the component mating faces.
- Install the O-ring seals.
- Tighten the 2 bolts to 10 Nm (7 lb.ft).
- Install the heat shield.
- Tighten the 4 nuts.
- Secure the exhaust mountings.
- Fill the A/C system. Refer to Air Conditioning (A/C) System Recovery, Evacuation and Charging article.
- Install the C-pillar lower trim panel. Refer to C-Pillar Lower Trim Panel article.
- Connect the battery ground cable. Refer to Specifications article.
- Install the spare wheel and tire.
- Stow the tool kit.
- Connect the exhaust extraction hoses to the tail pipes.
- Remove the coolant expansion tank cap.
- Top-up the coolant.
- Start and run the engine.
- Hold the engine speed at 2, 500 RPM for 30 seconds.
- Return the engine to idle for 30 seconds.
- Repeat the above procedure a further four times.
- Install the coolant expansion tank cap.
- Run the engine until the thermostat opens.
- Switch the engine off and allow to cool.
- Check and top-up the coolant if required.
NOTE:
When the coolant bleed is complete and prior to installing the expansion tank cap, top up the expansion tank 30mm above the maximum level.
