Thermostatic Expansion Valve: Installation
- Install the thermostatic expansion valve.
- Clean the components.
- Install the new O-ring seals.
- Tighten the Allen bolts to 5 Nm (4 lb.ft).
- Install the cover.
- Install the instrument panel upper section. Refer to Instrument Panel Upper Section .
- Recharge the A/C system. Refer to Air Conditioning (A/C) System Recovery, Evacuation and Charging .