Air Suspension Reservoir Solenoid Valve Block: Installation
- Install new Voss connectors to the air suspension reservoir solenoid valve block.
- Tighten to 2.5 Nm (1.7 lb.ft).
- Install the air suspension reservoir solenoid valve block.
- Secure the 3 valve block rubber insulators.
- Connect the electrical connectors.
- Connect the air lines into the Voss connector.
- Pull on each air line to make sure it is fully installed into the Voss connecter.
- Secure the air compressor electrical connector.
- Install the air suspension compressor lower cover.
- Install the bolts and tighten to 10 Nm (7 lb.ft).
- Using T4, pressurize the air suspension. See Air Suspension System Depressurize and Pressurize .
CAUTION:
Make sure the new Voss connector is installed and fully tightened with the alignment plug installed.
NOTE:
New air suspension components are supplied with new Voss connectors tightened to the correct torque. Do not install new voss connectors if a new component is being installed.
NOTE:
Make sure the valve block does not become detached during connection of the air lines.